Airport Authority of India built an Interim Terminal Constructing, a taxi monitor, and the apron place. The runway was strengthened to handle the Airbus A320 and Boeing 737 in addition to a pre-fabricated developing was erected to serve as a temporary terminal building.[9] The government of India had sanctioned somewhere around ₹100 crores for th